Exterior Structural Repairs Update 2/7/18

The structural repairs, installation of Hardie Board, and installation of sheetrock to ceilings are 100% complete at this time.  The painting and installation of railings are 85% completed.  Building A alley side should be fully completed in two weeks weather permitting.  IMG_0488.JPGIMG_0489.JPGIMG_0490.JPGIMG_0491.JPGIMG_0492.JPG